第1题
第2题
参考答案:错误
第3题
第4题
第5题
第6题
第7题
within, for, between, out, in, forward, to, with, by, at
Terms in Technical Contract
The Buyer agrees that the Seller will carry(1)the design, selection of material manufacturing, inspection and test of the equipment and materials supplied by the Seller according(2)the existing standards and codes of the Seller' s country. (3) one and a half months after signing the Contract, the Seller shall airmail(4)his own expense to the Buyer the said standards and codes(5)six copies.These documents shall be delivered in English as far as possible and the rest in German.The standards and codes shall be with indication of item numbers of the equipment and materials.The Buyer shall put(6)his comments(7)reference to the submitted standards and codes during the preliminary design meeting and the final agreement reached
(8)both parties through discussion shall be regarded as the basis for the inspection and test of the equipment and materials.
All the equipment and materials supplied(9)the Seller shall be inspected by the Seller and quality certificates and inspection and test records shall be issued by the manufacturers or the Seller.These documents shah be delivered to the Buyer as certificates of quality guarantee in accordance with the Contract.All expenses involved in the inspection and test of the equipment and materials shall be(10)the Seller's account.
第8题
In a sales contract of tinned goods, the contract stipulates: 24, 000 tins of goods shall be packed in 1000 cases, 500 grams each tin and 24 tins in a wooden case. When the buyer received the goods,he found the goods were packed in 500 cases,48 tins each case , and 500 grams each tin. The buyer rejected the goods.
Question: Does the buyer have the right to do so?
(Translate the case into Chinese and then answer the question)
Helpful hint: The case is mainly about packing clause in a contract.
第9题
第10题
A.The buyer has to pay for the goods before he gets the Bill of Exchange in the second situation.
B.The buyer has to sign the Bill of Lading in the first situation.
C.The buyer has to sign the Bill of Exchange in the first situation.
D.The buyer has to pay the Bill in the first situation.